OBJECTIVE:
2.1 The Objective of this SOP is to describe the procedure for Noise level measurement.
SCOPE:
3.1 This SOP is to describe the procedure for Noise level measurement.
RESPONSIBILITY:
4.1 The Maintenance Engineer shall be:
4.1.1 Responsible for checking the noise level measurement.
4.1.2 Responsible ...
OBJECTIVE: The Objective of this SOP is:
1 To describe the procedure for integrity testing of High Efficiency Particulate Air (HEPA) filters being used in Clean Room, De-pyrogenating Tunnel, Laminar Air Flow (LAF) unit and supply/exhaust air unit connected to the critical processes (wherever installed).
2 ...
OBJECTIVE The Objective of this SOP is to describe the procedure for operation of Chiller plant & Monitor the Performance of the Chiller plant.
SCOPE This SOP is applicable for the operation of Chiller plant. Installed in Utility at
RESPONSIBILITY
1 The Plant Operator shall be responsible for:
1.1 ...
OBJECTIVE: To describe the procedure for checking the quality of Stainless Steel (SS).
SCOPE: This SOP is applicable for the checking the quality of Stainless Steel (SS) installed
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 Responsible for procedure for the checking the quality of SS.
ACCOUNTABILITY: ...
OBJECTIVE: The Objective of this SOP is to describe the procedure for Airflow pattern checking.
SCOPE: This SOP is applicable for the describe the procedure for Airflow pattern checking
4.0 RESPONSIBILITY:
4.1 The Maintenance Engineer shall be responsible:
4.1.1 For Airflow pattern checking.
4.1.2 For ...
OBJECTIVE: The purpose of this SOP is: To describe the procedure for Calibration Of Hour Meter being used in various departments.
SCOPE: This SOP is applicable for the calibration of Hour meter installed in manufacturing & other Facilities of
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 ...
OBJECTIVE: The Objective of this SOP is to describe the procedure for checking the Earthing continuity.
SCOPE: This SOP is describing the procedure for checking the Earthing continuity.
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 Responsible for checking the Earthing continuity.
1.2 Responsible ...
1.0 OBJECTIVE:
To lay down a procedure for disposal of air filters.
2.0 SCOPE:
This SOP is applicable to all filters used at .
3.0 RESPONSIBILITY:
Technician / Engineer.
Head Of Department – Engineering.
4.0 PROCEDURE:
4.1 Take the filter to be disposed in polythene bag to `Scrap Yard’.
4.2 Label ...
1.0 OBJECTIVE: To lay down procedure of BMS operation & alarm handling of Air handling Unit.
2.0 SCOPE: This SOP is applicable for carrying out BMS operation of HVAC System equipment
.
3.0 RESPONSIBILITY:
Operator/Operating Person/Executive Engineering
3.1 BMS operator responsible for
3.1.1 To operate ...
1.0 OBJECTIVE: To lay down a procedure for Energy Review
2.0 SCOPE: This SOP is applicable to Energy management System.
3.0 RESPONSIBILITY:
1. Electrical Maintenance Department is responsible for measurement of electrical energy consumption at each location.
2. Concerned HOD is responsible for recording ...