SOP for Operation of Chiller Plant

OBJECTIVE The Objective of this SOP is to describe the procedure for operation of Chiller plant & Monitor the Performance of the Chiller plant.

SCOPE This SOP is applicable for the operation of Chiller plant. Installed in Utility at

RESPONSIBILITY
1 The Plant Operator shall be responsible for:
1.1 The operation of Chiller plant.
1.2 The maintaining the records.
1.3 Reporting for abnormal behavior.
2 The Maintenance Engineer shall be responsible for:
2.1 Corrective action in case of any deviation.
2.2 Verifying the performance parameters as per acceptance criteria.

ACCOUNTABILITY Head –Engineering Services

PROCEDURE:
1 STARTING PROCEDURE:
1.1 Switch `On’ the chilled water circulation pump to the Chiller.
1.2 Start the cooling tower as per SOP No.
1.3 Switch `On’ the mains of chiller panel.
1.4 Select ‘Auto ‘mode of main panel of chiller.
1.5 The Chiller will automatically start.
1.6 Maintain record in Log sheet. (Annexure-1).
2 STOPPING PROCEDURE:
2.1 Select the ‘STOP’ mode of chiller control panel.
2.2 Stop the cooling tower as per SOP No.
2.3 Stop the chilled water pump.