– All extraneous materials & equipments/accessories except relevant to this batch are removed
– Correct tooling is set in machine
– Check and ensure that right IBC has been set up to right compression machine
– Waste Bin is cleaned
– All the equipment inside the room ...
– All extraneous materials & equipments/accessories except relevant to this batch are removed
– Waste Bin is cleaned
– All the equipment inside the room including SS table utensils and scoops are cleaned
– All materials/ equipments are labeled properly
– All protective ...
– Quantity of inner carton for over printing to be determined on the basis of actual number of coated tablets received for blistering after coating
– All protective clothing of printing personnel i.e. dress, shoes and caps are properly cleaned
– All extraneous materials & equipment’s/accessories ...
– Incoming drums/ containers/ boxes/ bags are cleaned
– All materials according to Process Order (PO) are available
– No breakage/ leakage in the container
– No materials except relevant to this batch are present
– Correct materials of sufficient amount with approved label
– ...
All extraneous materials & equipments/accessories except relevant to this batch are removed
Waste Bin is cleaned
All the equipment inside the room including SS table utensils and scoops arecleaned
All materials/ equipments are labeled properly
All protective clothing of processing personnel i.e. ...