SOP for Disposal of Air Filters

1.0 OBJECTIVE: To lay down a procedure for disposal of air filters. 2.0 SCOPE: This SOP is applicable to all filters used at . 3.0 RESPONSIBILITY: Technician / Engineer. Head Of Department – Engineering. 4.0 PROCEDURE: 4.1 Take the filter to be disposed in polythene bag to `Scrap Yard’. 4.2 Label ...

SOP for BMS Operation & Alarm Handling

1.0 OBJECTIVE: To lay down procedure of BMS operation & alarm handling of Air handling Unit. 2.0 SCOPE: This SOP is applicable for carrying out BMS operation of HVAC System equipment . 3.0 RESPONSIBILITY: Operator/Operating Person/Executive Engineering 3.1 BMS operator responsible for 3.1.1 To operate ...

SOP for Energy Review

1.0 OBJECTIVE: To lay down a procedure for Energy Review 2.0 SCOPE: This SOP is applicable to Energy management System. 3.0 RESPONSIBILITY: 1. Electrical Maintenance Department is responsible for measurement of electrical energy consumption at each location. 2. Concerned HOD is responsible for recording ...

SOP for Shutdown Policy

1.0 OBJECTIVE: To lay down a procedure for shutdown of area or system or equipment. 2.0 SCOPE: This SOP is applicable for shut down work to be carried out. 3.0 RESPONSIBILITY: Concern User Department : Department Manager –Intimation to all sections QA : Review and approval for execution 4.0 ACCOUNTABILITY: ...

SOP for Water System Qualification

1.0 OBJECTIVE: To lay down the procedure for Qualification of Water System. 2.0 SCOPE: This SOP is applicable for qualification of water system at ……………………. 3.0 RESPONSIBILITY: 3.1 Engineering officer/executive will be responsible to run the system efficiently and to regenerate and sanitize ...

SOP for Operation of Nitrogen Plant

1.0 OBJECTIVE: To lay down the procedure for the operation of nitrogen plant. 2.0 SCOPE: This Standard Operating Procedure shall be applicable at formulation plant of ……………… 3.0 RESPONSIBILITY: Operator/Technician-Engineering shall be responsible for attending the minor, major breakdown maintenance ...

SOP for Cleaning of Split AC

1.0 OBJECTIVE: To lay down the procedure for the cleaning of split AC. 2.0 SCOPE: This SOP is applicable for the cleaning of split AC. 3.0 RESPONSIBILITY : Technician / Engineer. Head of Department – Engineering. 4.0 PROCEDURE: 4.1 Switch ‘OFF’ the mains supply of the split AC. 4.2 Remove the ...

SOP for AHU Operation

OBJECTIVE: To lay down a standard procedure for operation of Air Handling Unit. SCOPE: This SOP covers complete smooth operation of Air Handling Unit. RESPONSIBILITY: AC Technician, Officer and Executive. ACCOUNTABILITY: Head – Engineering. REFERENCES: In House ATTACHMENTS: Nil PROCEDURE 1.0 STARTING ...

SOP for Calibration of Pressure Gauges

OBJECTIVE: The Objective of this SOP is To describe the procedure for Calibration Of Pressure Gauges. SCOPE: This SOP is applicable for the calibration of Pressure Gauge installed in manufacturing & Other Facilities of RESPONSIBILITY: The Maintenance Engineer shall be: Responsible for Calibration ...

SOP for Filter Cleaning

OBJECTIVE: To laydown standard procedure for cleaning of AHU FILTERS. SCOPE: This SOP covers all the microvee filters for all AHU. RESPONSIBILITY: Contractor, Operator, Officer and Executive. ACCOUNTABILITY: Head – Engineering. REFERENCES: In house ATTACHMENTS: Attachment-1 FILTER CLEANING RECORD PROCEDURE 1.0 ...