OBJECTIVE: The Objective of this SOP is to describe the procedure for checking the Earthing continuity.
SCOPE: This SOP is describing the procedure for checking the Earthing continuity.
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 Responsible for checking the Earthing continuity.
1.2 Responsible ...
1.0 OBJECTIVE:
To lay down a procedure for disposal of air filters.
2.0 SCOPE:
This SOP is applicable to all filters used at .
3.0 RESPONSIBILITY:
Technician / Engineer.
Head Of Department – Engineering.
4.0 PROCEDURE:
4.1 Take the filter to be disposed in polythene bag to `Scrap Yard’.
4.2 Label ...
1.0 OBJECTIVE: To lay down procedure of BMS operation & alarm handling of Air handling Unit.
2.0 SCOPE: This SOP is applicable for carrying out BMS operation of HVAC System equipment
.
3.0 RESPONSIBILITY:
Operator/Operating Person/Executive Engineering
3.1 BMS operator responsible for
3.1.1 To operate ...
1.0 OBJECTIVE: To lay down a procedure for Energy Review
2.0 SCOPE: This SOP is applicable to Energy management System.
3.0 RESPONSIBILITY:
1. Electrical Maintenance Department is responsible for measurement of electrical energy consumption at each location.
2. Concerned HOD is responsible for recording ...
1.0 OBJECTIVE: To lay down a procedure for shutdown of area or system or equipment.
2.0 SCOPE: This SOP is applicable for shut down work to be carried out.
3.0 RESPONSIBILITY:
Concern User Department : Department Manager –Intimation to all sections
QA : Review and approval for execution
4.0 ACCOUNTABILITY: ...
1.0 OBJECTIVE: To lay down the procedure for Qualification of Water System.
2.0 SCOPE: This SOP is applicable for qualification of water system at …………………….
3.0 RESPONSIBILITY:
3.1 Engineering officer/executive will be responsible to run the system efficiently and to regenerate and sanitize ...
1.0 OBJECTIVE: To lay down the procedure for the operation of nitrogen plant.
2.0 SCOPE: This Standard Operating Procedure shall be applicable at formulation plant of ………………
3.0 RESPONSIBILITY:
Operator/Technician-Engineering shall be responsible for attending the minor, major breakdown maintenance ...
1.0 OBJECTIVE: To lay down the procedure for the cleaning of split AC.
2.0 SCOPE: This SOP is applicable for the cleaning of split AC.
3.0 RESPONSIBILITY :
Technician / Engineer.
Head of Department – Engineering.
4.0 PROCEDURE:
4.1 Switch ‘OFF’ the mains supply of the split AC.
4.2 Remove the ...
OBJECTIVE: To lay down a standard procedure for operation of Air Handling Unit.
SCOPE: This SOP covers complete smooth operation of Air Handling Unit.
RESPONSIBILITY: AC Technician, Officer and Executive.
ACCOUNTABILITY: Head – Engineering.
REFERENCES: In House
ATTACHMENTS: Nil
PROCEDURE
1.0 STARTING ...
OBJECTIVE: The Objective of this SOP is To describe the procedure for Calibration Of Pressure Gauges.
SCOPE: This SOP is applicable for the calibration of Pressure Gauge installed in manufacturing & Other Facilities of
RESPONSIBILITY:
The Maintenance Engineer shall be:
Responsible for Calibration ...