Purpose: To lay down operating procedure of A.C. unit.
Scope: This procedure is applicable to ……………
Responsibility: Production Chemist
To supervise the activity
Operating procedure:
Set the parameters on control panel as per requirement.
a) Main control knob:
1. Off: Stops ...
Purpose: To lay down operating procedure for operation of Soft Water plant.
Scope: This procedure is applicable to ……………
Responsibility: Production Chemist
To supervise the activity
Equipment used: Softener (Indion NGS – 3B)
Operating procedure:
1. Check the cleaning ...
Purpose: To lay down operating procedure for regeneration of demineralized water plant.
Scope: This procedure is applicable for …………….
Responsibility: Production Chemist
To supervise the activity
EQUIPMENTS USED:
1. Portable Deioniser
a) For anions & cations (Model ...
Purpose: To lay down operating procedure for regeneration of soft water plant.
Scope: This procedure is applicable to ………………..
Responsibility: Production Chemist
To supervise the activity
Equipment used: Softener (Indion NGS – 3B)
Regeneration procedure:
Brine ...
OBJECTIVE:
2.1 The Objective of this SOP is to describe the procedure for Noise level measurement.
SCOPE:
3.1 This SOP is to describe the procedure for Noise level measurement.
RESPONSIBILITY:
4.1 The Maintenance Engineer shall be:
4.1.1 Responsible for checking the noise level measurement.
4.1.2 Responsible ...
OBJECTIVE: The Objective of this SOP is:
1 To describe the procedure for integrity testing of High Efficiency Particulate Air (HEPA) filters being used in Clean Room, De-pyrogenating Tunnel, Laminar Air Flow (LAF) unit and supply/exhaust air unit connected to the critical processes (wherever installed).
2 ...
OBJECTIVE The Objective of this SOP is to describe the procedure for operation of Chiller plant & Monitor the Performance of the Chiller plant.
SCOPE This SOP is applicable for the operation of Chiller plant. Installed in Utility at
RESPONSIBILITY
1 The Plant Operator shall be responsible for:
1.1 ...
OBJECTIVE: To describe the procedure for checking the quality of Stainless Steel (SS).
SCOPE: This SOP is applicable for the checking the quality of Stainless Steel (SS) installed
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 Responsible for procedure for the checking the quality of SS.
ACCOUNTABILITY: ...
OBJECTIVE: The Objective of this SOP is to describe the procedure for Airflow pattern checking.
SCOPE: This SOP is applicable for the describe the procedure for Airflow pattern checking
4.0 RESPONSIBILITY:
4.1 The Maintenance Engineer shall be responsible:
4.1.1 For Airflow pattern checking.
4.1.2 For ...
OBJECTIVE: The purpose of this SOP is: To describe the procedure for Calibration Of Hour Meter being used in various departments.
SCOPE: This SOP is applicable for the calibration of Hour meter installed in manufacturing & other Facilities of
RESPONSIBILITY:
1 The Maintenance Engineer shall be:
1.1 ...