All extraneous materials & equipments/accessories except relevant to this batch are removed
Waste Bin is cleaned
All the equipment inside the room including SS table utensils and scoops arecleaned
All materials/ equipments are labeled properly
All protective clothing of processing personnel i.e. dress, shoes, caps, masks, hand gloves are properly cleaned
Temperature, Relative Humidity and Pressure Difference are within the specified limit
All the balances and machine/ equipment used are calibrated
Exhaust System working properly
Properly Labeled and correct materials are in accordance with BMR.
Check that the room and equipment logbook have been completed