All extraneous materials & equipments/accessories except relevant to this batch are removed
Waste Bin is cleaned
All the equipment inside the room including SS table utensils and scoops arecleaned
All materials/ equipments are labeled properly
All protective clothing of processing personnel i.e. ...
1 Ensure that product containers, materials, status labels, BPR of previous process operation are removed.
2 Ensure that area is cleaned as per the cleaning procedure and records are updated.
3 Ensure that temperature, relative humidity and differential pressure of the area is suitable for dispensing.
4 Ensure ...
1. Check and ensure that the area/ equipment/ belt are visually clean.
2. Check the area is free from previous product and unwanted materials
3. Check the proper gowning of personnel.
4. Check the present status label which shows the details.
5. Verify the issued secondary packaging material with respect ...
1. Ensure that product containers, materials, status labels, BMR of previous process operation and relevant documents are removed. Ensure that area along with respective equipments is cleaned as per the cleaning procedure and records are updated and within validity period as per production SOP.
2. Ensure ...
All the packing materials are taken as per the standard quantity
All the packing materials are approved by Quality Control which are taken for packing.
The product label are issued on / count weigh basis
Is line clearance has taken from previous product for packing
Are the over coding ...
=>> The product shippers are in good conditions.
=>> The product labels, approved labels are pasted and are intact.
=>> Verify the shipper label details: Fill weight, name of the product, Batch No. Date of Manufacturing, Date of Expiry and ensure.
=>> Verify Batch details / filled value of the inner ...
1. Ensure that product containers, materials, status labels, BMR of previous process operation and relevant documents are removed.
2. Ensure that area along with respective equipments is cleaned as per the cleaning procedure and records are updated and within validity period as per production SOP.
3. ...
1. Check and ensure that the area/ equipment/ are visually clean.
2. Check the area is free from previous product and unwanted materials
3. Ensure the temperature and relative humidity are within the specified limit as per mentioned in BMR.
4. Check the present status label which shows the details.
5. ...
All the materials taken for production are approved.
All the quality raw materials used for Blending/Sieving/Milling are weighed and recorded correctly.
All the materials have been taken as per the standard quantity
Is the Quantity of active ingredients taken for batch calculated correctly?
Line ...
The raw materials and packing materials are issued to the production after approval from quality control.
All the raw materials issued to production are within the retest period as appropriate.
Verify the RM and PM dispensing tag attached to the BPRR/BPAR.
Ensure FIFO is followed during ...