– All extraneous materials & equipments/accessories except relevant to this batch are removed
– Correct tooling is set in machine
– Check and ensure that right IBC has been set up to right compression machine
– Waste Bin is cleaned
– All the equipment inside the room including SS table utensils and scoops are cleaned
– All materials/ equipments are labeled properly
– All protective clothing of processing personnel i.e. dress, shoes, caps, masks, hand gloves are properly cleaned
– Temperature, Relative Humidity and Pressure Difference are within the speechified limit
– All the balances and machine/ equipment are calibrated
– Exhaust System working properly
– Properly Labeled and correct materials are in accordance with BMR
– Check that the room and equipment logbook have been completed