1.0 OBJECTIVE: To lay down procedure of BMS operation & alarm handling of Air handling Unit.
2.0 SCOPE: This SOP is applicable for carrying out BMS operation of HVAC System equipment
.
3.0 RESPONSIBILITY:
Operator/Operating Person/Executive Engineering
3.1 BMS operator responsible for
3.1.1 To operate ...
Objective: To establish a standard procedure for operating the Air-cooled Reciprocating chiller (Model-CR-18002A)
Scope: This procedure is applicable for the operation of Air -cooled reciprocating chiller, Model-CR 18002A of (Company Name).
Responsibility
1 Operator shall be responsible for following ...
Objective To establish a standard procedure for operation of DOP tester.
Scope This SOP is applicable for the operation of Aerosol Photometer (Model: TDA-2GN) and the aerosol generator (Model: TDA-5B) of (Company Name).
Responsibility
=>> Maintenance Engineer shall be responsible to follow the procedure ...