1.0 OBJECTIVE : To set up a procedure for the calibration of High Vacuum Pump and digital flow meter.
2.0 SCOPE : This SOP is applicable for calibration of High Vacuum Pumps and digital flow meters which are installed in Quality Control Department of (Company Name).
3.0 RESPONSIBILITY
3.1 QC Officer/Analyst ...