The installation qualification confirms that the specified equipment, including all parts, spares, service gauges, and other necessary materials, was delivered and installed in accordance with the planned schedule and in flawless condition. It serves as written proof that the apparatus was correctly fitted and calibrated. The purpose of IQ is to ensure that all facets of the equipment are set up correctly and adhere to the original (URS) design. According to the manufacturer’s installation guidelines, the working conditions have been documented and verified as being suitable for the instrument’s operation.
The documentation of installation includes:
• details of supplier and manufacture
• equipment name, colour, model, and serial number
• date of installation and calibration