OBJECTIVE: The Objective of this SOP is to describe the procedure for Airflow pattern checking.
SCOPE: This SOP is applicable for the describe the procedure for Airflow pattern checking
4.0 RESPONSIBILITY:
4.1 The Maintenance Engineer shall be responsible:
4.1.1 For Airflow pattern checking.
4.1.2 For ...
1.0 OBJECTIVE: To lay down the procedure for the operation of nitrogen plant.
2.0 SCOPE: This Standard Operating Procedure shall be applicable at formulation plant of ………………
3.0 RESPONSIBILITY:
Operator/Technician-Engineering shall be responsible for attending the minor, major breakdown maintenance ...
Objective: To establish a standard maintenance procedure of Hoist
Scope: This SOP is applicable for Hoist of (Company Name).
Responsibility
1. Operator shall be responsible to follow the procedure strictly.
2. Supervisor shall be responsible to ensure that the SOP is followed properly.
Accountability: ...
Objective: To establish a standard preventive maintenance procedure for Electrical Lift.
Scope: This SOP is applicable for the Electrical Lifts installed at (Company Name).
Responsibility
1 Maintenance Engineer shall be responsible to follow the procedure strictly.
2 Supervisor shall be responsible ...
Objective: To establish a standard operating procedure for challenge test of BAS system.
Scope: This SOP is applicable for the Building Automation Systems of OSD and MDI Units of (Company Name).
Responsibility
1 Operator shall be Responsible to follow the procedure strictly.
2 Supervisor shall be responsible ...
1.0 OBJECTIVE
To establish a standard operating procedure for startup and stop of Purified Water System.
2.0 SCOPE
This SOP is applicable for the Building Automation Systems of OSD Units of (Company Name).
3.0 RESPONSIBILITY
3.1 Operator shall be Responsible to follow the procedure strictly.
3.2 Supervisor ...
Objective: To establish a standard procedure for operation of Air Compressor and Air Dryer.
Scope: This procedure is applicable for Air Compressors (Atlas Copco, Model: ZT 75 & ZT 50 VSD) and Air Dryers (Atlas Copco, Model: CD 230) installed in Utility Building, (Company Name).
Responsibility:
1 ...
Objective: To establish a standard preventive maintenance procedure for Boiler.
Scope: This SOP is applicable for the preventive maintenance of Boilers (Cleaver Brookes, Model: CIW-700-200-150 & CIW-700-125-150) installed at the utility building of (Company Name).
Responsibility