Operation of Building automation System from operator work station (OWS)

Objective: To establish a standard operating procedure for operation of Building Automation system from Operator Work Station (OWS).

Socpe: This SOP is applicable for the Building Automation Systems of OSD and MDI Units of (Comapany Name).

Responsibility:
1. Operator shall be Responsible to follow the procedure strictly.

2. Supervisor shall be responsible to ensure that the SOP is followed properly.

Accountability: Head of Engineering.

Precautions:
=>> Concerned personnel should be trained on the SOP.
=>> Ensure that power supply back up from UPS is available for the OWS and NCU (Network Control Unit).
=>> Ensure that cable connections at the hub between the NCU and OWS are properly secured.
=>> Ensure that the printer is connected with the OWS and is functioning properly.

Procedure:
=>> Switch ON the OWS (PC).
=>> Click on “Start” Menu.
=>> Select “Johnson Controls” from the “Programs” menu.
=>> Click on “M5” from “Johnson Controls” menu.
=>> Click “Metasys” from the M5 software options. A screen will arrive with FMS Log on menu.
=>> Select the network (BCD) and enter the password in the FMS Log on menu. The Network Map-BCD screen will be displayed.
=>> From the Network Map-BCD screen, operate the Building Automation System as per requirements.
=>> For display of graphics, go to Desktop and press “main.gdf” logo. The graphics for the BAS will be displayed.
=>> To see and save the trend data, go to “Trend” from the Network Map-BCD screen. Select the particular item to see and save the data.
=>> To take print outs, click “print” option from the text and graphics displays.